Header Tank on Stone Plinth

  • Medium
  • €40–100
  • ⏱ 1 day (2 workers)
  • With supervision
Header Tank on Stone Plinth — step-by-step guide

The principle

Multi-barrier, not single-point. Sediment, then biology, then storage on a level plinth so water always flows where you want it. Food-grade containers only — never a tank that once held chemicals.

Materials

  • Reclaimed barrel/IBC (100-200L)
  • stone plinth (granite
  • gravel
  • mortar if needed)
  • food-grade hose
  • brass/stainless valves

Tools

  • Spade
  • level
  • cold chisel
  • mallet
  • drill
  • spanner

Reclaimed from

IBCs/barrels (reclaimed) + site stone + Leroy Merlin